What size chiller does a cold plunge need?

Enter the tub and the temperatures. You get the chiller size, how long it takes to cool down, and what it costs each month against buying ice.

The tub

Temperatures

Use the warmest air the tub sits in. A garage in July counts.

How you will use it

Prices

Leave the chiller price empty to use a typical price for the size.

Your plunge needs a

1/4 HP chiller

Look for at least 2,400 BTU an hour of cooling. That takes 100 gallons from 65°F (18°C) to 45°F (7°C) in about 7.3 hours.

That is close to the limit of a 1/4 HP unit. A 1/3 HP chiller cools down in about 5.2 hours and has room to spare on hot days.

Tick marks are chiller sizes in horsepower. Horsepower labels are loose: two "1/2 HP" units can differ by half in real cooling. Buy on the rated BTU an hour at your target water temperature.

Every size against this tub

ChillerTime to cool downHolds 45°F
1/4 HPabout 2,500 BTU/h7.3 hours6.0 hours to 9.4 hoursYes
1/3 HPabout 3,400 BTU/h5.2 hours4.7 hours to 6.0 hoursYes
1/2 HPabout 5,000 BTU/h3.5 hours2.9 hours to 4.4 hoursYes
3/4 HPabout 7,000 BTU/h2.5 hours2.1 hours to 2.9 hoursYes
1 HPabout 9,300 BTU/h1.8 hours1.4 hours to 1.9 hoursYes

The heat involved

Heat to remove on the first cool-down100 gal × 8.34 lb × 20°F16,680 BTU
Heat leaking in while it holds75°F (24°C) air around 45°F (7°C) water220 BTU/h
Electricity to hold temperaturelikely range 0.4 to 0.80.6 kWh a day
Running costat $0.18 per kWh, left on around the clock$3.38 a month

Or use ice

Ice for the first cool-downabout $31.87 at $0.30 a pound106 lb
Ice before each plunge after thatthe water drifts back to about 54°F between plunges49 lb
Ice cost$14.75 a plunge, 4 plunges a week$256 a month
Chiller pays for itself in$650 chiller against ice at this rate of use2.6 months

1/4 HP chiller. About $3.38 a month to run.See the working

Chiller size by tub volume

Each row cools from 65°F to 45°F within 8 hours in 75°F air. The link opens the full working for that size.

TubInsulated with a lidLid, bare wallsNo lid, no insulation
50 gallons1/4 HP1,180 BTU/h1/4 HP1,800 BTU/h1/4 HP2,080 BTU/h
80 gallons1/4 HP1,860 BTU/h1/3 HP2,710 BTU/h1/3 HP3,090 BTU/h
100 gallons1/4 HP2,300 BTU/h1/3 HP3,290 BTU/h1/2 HP3,730 BTU/h
150 gallons1/2 HP3,420 BTU/h1/2 HP4,710 BTU/h3/4 HP5,290 BTU/h
200 gallons1/2 HP4,520 BTU/h3/4 HP6,090 BTU/h3/4 HP6,790 BTU/h
300 gallons3/4 HP6,710 BTU/h1 HP8,770 BTU/hOver 1 HP9,680 BTU/h

Insulation matters more than horsepower

Once the water is cold, the chiller only has to remove the heat that leaks back in. A lid and insulated walls cut that leak to a fraction, so a small chiller holds the temperature and barely runs. A bare tub in a warm garage can leak heat faster than a small chiller removes it.

More tools and guides

Common questions

What size chiller do I need for a 100 gallon cold plunge?

For an insulated 100 gallon tub with a lid in 75°F air, cooling from 65°F to 45°F within 8 hours takes about 2,305 BTU an hour, which a 1/4 HP chiller covers. The same tub with no lid or insulation in 85°F air needs about 4,282 BTU an hour, a 1/2 HP unit.

Should I size a chiller by horsepower or BTU?

By BTU an hour. Horsepower labels on plunge chillers are loose: published capacities for "1/2 HP" units run from about 4,000 to 6,000 BTU an hour. Compare the rated cooling at your target water temperature.

How much does a cold plunge chiller cost to run?

It depends almost entirely on insulation. Holding an insulated 100 gallon tub at 45°F in 85°F air takes about 0.8 kWh a day, or $4.51 a month at $0.18 per kWh. With no lid or insulation the same tub takes about 6.2 kWh a day, or $33.84 a month.

How long does a chiller take to cool a cold plunge?

Divide the heat to remove by the chiller's spare capacity. A 100 gallon tub dropping 20°F holds 16,680 BTU of heat to remove, so a 1/4 HP chiller takes about 7.3 hours.